Energy drinks – a complete automation project for a production plant

Back to Completed Projects

"... project implementation went smoothly..." - Member of the Management Board

Investment description:

Complete automation design and construction of an energy drinks production plant (syrup room and CIP station).

Effect

  • high quality and full functionality adjusted to the customer’s price requirements
  • I&C project system operation with two panel computers
  • transparency and simplicity of use (SCADA systems), with technological and automatic complexity
  • power supply cabinet and two control cabinets (syrup room and CIP station), wiring, control and measurement apparatus

Solutions

  • freely programmable controllers of the CP6701 family by Beckhoff,
  • Ethernet network,
  • KL series input/output modules (there are over 350 I/O in the system),
  • panel computers with the InduSoft visualization system,
  • SCADA system

Robotized bag palletizing line

“The solutions implemented by iPS Control® allowed us to increase production efficiency, save time and money, while maintaining high quality standards” Effect production and delivery

More

Contact us

Poznańska street 23
Jasin 62-020 (post office: Swarzędz)

+ 48 61 840 80 26

office@ipscontrol.pl

© Copyright 2024 iPS Control®
Contact details
Data for contracts and invoices
Call Now Button